اختبار شهادة كومبتيا إدارة الخوادم Server+ SK0-005

السؤال 321 من 489

كل الأسئلة

A site is considered a warm site when it:

الخيارات

  • A has basic technical facilities connected to it.
  • B has faulty air conditioning that is awaiting service.
  • C is almost ready to take over all operations from the primary site.
  • D is fully operational and continuously providing services.

النقاشات

لا توجد نقاشات منشورة لهذا السؤال حالياً.