اختبار شهادة إدارة المشاريع Project Management Professional (PMP)

السؤال 371 من 874

كل الأسئلة

A project was recently flagged as being noncompliant during an inspection. Several options were suggested on how to address the noncompliance, but each may have different impacts on the budget, schedule, and quality.
How should the project manager proceed?

الخيارات

  • A Review the risk register.
  • B Perform a cost-benefit analysis.
  • C Determine the cost of change.
  • D Conduct a root cause analysis (RCA).

النقاشات