اختبار شهادة الشبكات CompTIA Network+

السؤال 583 من 748

كل الأسئلة

Two companies successfully merged. Following the merger, a network administrator identified a connection bottleneck. The newly formed company plans to acquire a high-end 40GB switch and redesign the network from a three-tier model to a collapsed core. Which of the following should the administrator do until the new devices are acquired?

الخيارات

  • A Implement the FHRP.
  • B Configure a route selection metric change.
  • C Install a load balancer.
  • D Enable link aggregation.

النقاشات

لا توجد نقاشات منشورة لهذا السؤال حالياً.