اختبار شهادة سيسكو Cisco CCNA Exam

السؤال 389 من 522

كل الأسئلة

Refer to the exhibit. The New York router is configured with static routes pointing to the Atlanta and Washington sites. Which two tasks must be performed so that the Se0/0/0 interfaces on the Atlanta and Washington routers reach one another? (Choose two.)

الخيارات

  • A Configure the ipv6 route 2023::/126 2012::1 command on the Atlanta router.
  • B Configure the ipv6 route 2012::/126 2023::2 command on the Washington router.
  • C Configure the ipv6 route 2023::/126 2012::2 command on the Atlanta router.
  • D Configure the ipv6 route 2012::/126 s0/0/0 command on the Atlanta router.
  • E Configure the ipv6 route 2012::/126 2023::1 command on the Washington router.

النقاشات

لا توجد نقاشات منشورة لهذا السؤال حالياً.